2019 |
Successful Commissioning of Fully factory Assembled chicken waste oil cum diesel fired steam boiler for Processed food Complex in Middle east |
Successful Commissioning of Fully factory Assembled Natural Gas Based Cogeneration Plant in Africa |
|
2018 |
Successful Commissioning of Fully Automatic, Continuous Jaggery Plant with patented and hygienic process. |
2017 |
Launch of Super-efficient Semi-Automatic Solid Fuel fired Non-IBR Steam Boiler -EZYENERGI |
Launch of Super-efficient Semi-Automatic Solid Fuel fired Small Industrial Boiler (EZYFYRE) |
|
First in India to successfully install Fully Automatic Solid fuel fired Hot Air Generator (AIRPACK SF–I and AIRPACK SF-D) |
|
2015 |
First in India to successfully install Super-efficient Fully Automatic Instant Steaming Solid Fuel fired Steam boiler – ENERGYMIZER (Thermal Efficiency – 85% on NCV of Fuel) |
2015 |
First in India to successfully install Super-efficient Natural Gas fired Steam Boiler with Condensing Economizer - GREENSTAR SUPERPLUS ® (Thermal Efficiency – 100% on NCV of Fuel) |
2014 |
First in India to successfully install Zero Liquid Discharge system with online self-cleaning arrangement |
2012 |
Commencement of manufacturing operations Unit 3 (Lonand) |
2011 |
Successful installation of Superefficient Hydrogen Fired boiler |
Societal Innovation Award of year 2011 by NRDC and WIPO Gold Medal for Development of “Automatic, Continuous, Energy and Water Conserving, Hygienic Process for Manufacturing Improved Quality Jaggery” |
|
2010 |
First in India to successfully install Super-efficient Natural Gas fired Steam Boiler with Condensing Economizer - STEAMSTAR SUPERPLUS ® (Thermal Efficiency – 102% on NCV of Fuel) |
First in India to successfully install Super-efficient Oil-fired Hot Water Generator - AQUAWARM SUPERPLUS ® (Thermal Efficiency – 98% on NCV of Fuel) |
|
2009 |
DSIR recognition for in-house R&D center |
2008 |
DSIR award for in-house R&D efforts in Clean Energy & Climate Change category for technology of “Waste heat Recovery Power Plants for Cement Industry” |
2007 |
First in India to successfully install Waste Heat Recovery Steam Boiler for Glass Industry |
2006 |
Successful installation of technology demonstration project for Sugar Mill energy conservation using super-efficient seven stage sugarcane juice evaporator with thermo-compressor |
2005 |
First in India to successfully install indigenous, in-house developed Waste Heat Recovery Power Plant (Steam Rankine Cycle) for Cement plant |
First in India to successfully install indigenous, in-house developed Waste Heat Recovery Power Plant (Organic Rankine Cycle) for Cement plant |
|
First in India to successfully install BFG fired Steam Boiler STEAMSTAR BFG without support fuel |
|
First in India to successfully install Ammonia Absorption Refrigeration Plant working at -54°C for freeze dried largest coffee plant |
|
2004 |
Waste Heat Recovery in Ceramic Industry |
2003 |
Fully automatic, high efficiency, solid fuel fired, Steam Boiler - TEJASWEE with Water-Cooled Oscillating Grate |
2001 |
Commencement of manufacturing operations at Unit 2 (Bhosari) Pune |
1999 |
Multistage Evaporators — Steam / Hot water driven |
Co-generation (Trigeneration) System in Dairy Industry |
|
First installation of Super-efficient Smoke-tube type Oil fired Steam Boiler - STEAMSTAR SUPER (Thermal Efficiency – 93% on NCV of Fuel) |
|
1997 |
First installation of Ammonia Absorption Refrigeration Plant |
1996 |
First installation of Waste Heat Recovery Boilers – RECOSTAR |
1989 |
First installation of Super-efficient Thermal Oil Heater – FLUIDTHERM (Thermal Efficiency – 93% on NCV of Fuel) |
First installation of Hot Air Generators — AIRPACK |
|
First installation of Super-efficient Smoke-tube type Oil fired Steam Boiler - STEAMSTAR (Thermal Efficiency – 93% on NCV of Fuel) |
|
1988 |
First installation of Smoke-tube type Oil fired Steam Boiler - STEAMSTAR (Thermal Efficiency – 89% on NCV of Fuel) |
First installation of Super-efficient Coil-type Once Through Oil fired Non-IBR Non- IBR Steam Boilers- STEAM PACK (Thermal Efficiency – 93% on NCV of Fuel) |
|
Commencement of manufacturing operations at Unit 1 (Shirwal) |
|
1986 |
Inception of Company (formerly known as Vapor Energy Machines Pvt. Ltd.) |